HIT SRL

Engineering, Contracting, Port Equipment, Spare Parts

EN IT AR DE EL ES FA FR HE HI ID JA KO PL PT RU SQ SW TH TL TR UK VI ZH

ENGINEERING, CONTRACTING, PORT EQUIPMENT, SPARE PARTS

+39-0522-1756017 – +39 0522 506100

info@hitsrl.it

  • Home
  • Who we are
    • Legal Disclaimer
    • Policy
  • What we do
    • FAQ
    • Industrial & Solar Plants
    • Procurement Service
    • Revamping
    • Service
    • SPARE PARTS
    • Spare Parts Manager
    • Used Equipment
  • Where we are
    • Contact
  • News
    • Gallery
  • Spare parts
    • Spare parts – overview
    • AFTERMARKET spare parts
    • ALLISON PARTS
    • BATTIONI PAGANI SPARE PARTS
    • BELOTTI
    • CUMMINS
    • CVS FERRARI
    • CVS FERRARI SPARE PARTS
    • DANA CLARK PARTS
    • FANTUZZI REGGIANE
    • FANTUZZI SPARE PARTS
    • GENUINE spare parts
    • HYSTER SPARE PARTS
    • KALMAR
    • KESSLER PARTS
    • KONECRANES SPARE PARTS
    • LINDE SPARE PARTS
    • MAFI SPARE PARTS
    • NOELL
    • OEM spare parts
    • ORIGINAL spare parts
    • PPM SPARE PARTS
    • REGGIANE CRANE AND PLANTS
    • REXROTH PARTS
    • SANY
    • SCANIA
    • SMV SPARE PARTS
    • Spare parts for crane
    • Spare parts for Empty loader
    • Spare parts for forklift
    • Spare parts for Mobile Harbour Crane MHC
    • Spare parts for port equipment
    • Spare parts for reachstacker
    • Spare parts for RTG
    • Spare parts for Side loader
    • Spare parts for Straddle carrier
    • Spare parts for STS
    • Spare parts for Terminal Tractor
    • SVETRUCK
    • TAYLOR
    • TERBERG
    • TEREX
    • VOLVO
    • ZPMC
  • Catalogue
Home » Technical Resources » Legacy Machine Guides » Fantuzzi Reggiane MHC 115 » Electrical and control

Fantuzzi Reggiane MHC 115 — Electrical and control: technical cards

HIT SRL technical desk · Fantuzzi Reggiane MHC 115 technical cards · Published 8 October 2026 · Updated 8 October 2026

General guidance only — always follow the operation and maintenance manual for your specific machine.

Short answers to precise questions on the electrical system and control system of the Fantuzzi Reggiane MHC 115 mobile harbour crane, one fact per card, each with its source stated in the text. For the overall picture, see the Fantuzzi Reggiane MHC 115 technical legacy guide.

Questions on this page

  1. Fantuzzi Reggiane MHC 115: which control system does the crane have?
  2. Fantuzzi Reggiane MHC 115: how is the electrical system built?
  3. Fantuzzi Reggiane MHC 115: which indications does the control system of the 75 t version show in the cab?
  4. Fantuzzi Reggiane MHC 115: can the crane be worked from two stations at once?
  5. Fantuzzi Reggiane MHC 115: how does the ALC drive the boom pumps?
  6. Fantuzzi Reggiane MHC 115 BDE: what does the electric motor drive?
  7. Fantuzzi Reggiane MHC 115: when does the ALC system block boom lowering?
  8. Fantuzzi Reggiane MHC 115: can the boom be raised with the crane not stabilised?

Fantuzzi Reggiane MHC 115: which control system does the crane have?

HIT SRL technical desk · Fantuzzi Reggiane MHC 115 technical card · October 2026

The ALC system according to the 2002 edition and the ALC description of the 75 t version, and ESX central units in the manuals from the 11/2002 edition, as recorded at HIT SRL. The ALC description gives three slave units on the single-winch MHC 115, as on the MHC 65, 40 and 20, and four on the double-winch MHC 115, as recorded by the HIT SRL technical desk.

Source: HIT SRL technical desk — https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-control-system · HIT ref MHC115-046 · fingerprint 608dc0 · see HIT ref MHC115-052, https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-alc-boom-lowering-blocks

Fantuzzi Reggiane MHC 115: how is the electrical system built?

HIT SRL technical desk · Fantuzzi Reggiane MHC 115 technical card · October 2026

With two 205 Ah batteries for controls and engine start, charged by the generator, and 380/220 V from the engine-driven generator, according to the use and maintenance manual of the 75 t version, as HIT SRL's technical desk reads it. The manual uses separate protected and numbered circuits in flame-retardant cables, as logged by the HIT SRL technical desk. The same manual interlocks the cabinet doors against opening when live and fits aviation red lights and a rotating beacon, as recorded by the HIT SRL technical desk.

Source: HIT SRL technical desk — https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-electrical-system · HIT ref MHC115-047 · fingerprint b021d7 · see HIT ref MHC115-051, https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-bde-electric-drive

Fantuzzi Reggiane MHC 115: which indications does the control system of the 75 t version show in the cab?

HIT SRL technical desk · Fantuzzi Reggiane MHC 115 technical card · October 2026

Engine oil pressure, oil and water temperature, fuel level and hour meter, hydraulic oil pressure and temperature, and load indication with overload alarm and boom angle, according to the use and maintenance manual of the 75 t version, the HIT SRL technical desk notes. The manual adds a troubleshooting function and black-box recording, as recorded by the HIT SRL technical desk.

Source: HIT SRL technical desk — https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-cab-indications · HIT ref MHC115-048 · fingerprint c64775 · see HIT ref MHC115-046, https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-control-system

Fantuzzi Reggiane MHC 115: can the crane be worked from two stations at once?

HIT SRL technical desk · Fantuzzi Reggiane MHC 115 technical card · October 2026

No: when the crane is worked from one of its three stations, upper cab, lower cab or portable control unit, the controls of the others are disabled, according to the use and maintenance manual of the 75 t version, as recorded at HIT SRL. The manual requires the cab key to be off before the portable unit can be used, as logged by the HIT SRL technical desk. According to the same manual, movements come from one station at a time, as recorded by the HIT SRL technical desk.

Source: HIT SRL technical desk — https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-operator-stations · HIT ref MHC115-049 · fingerprint d4ed3b · see HIT ref MHC115-077, https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/safety-and-interlocks/#hit-mhc115-simultaneous-movements

Fantuzzi Reggiane MHC 115: how does the ALC drive the boom pumps?

HIT SRL technical desk · Fantuzzi Reggiane MHC 115 technical card · October 2026

The boom movement output drives two solenoid valves in parallel, for boom pumps 1 and 2, according to the ALC description of the 2002 manual, as HIT SRL's technical desk reads it. The same description gives the MHC 65, 40 and 20 a single boom pump, as recorded by the HIT SRL technical desk.

Source: HIT SRL technical desk — https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-boom-pumps-output · HIT ref MHC115-050 · fingerprint 5c4de4 · see HIT ref MHC115-052, https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-alc-boom-lowering-blocks

Fantuzzi Reggiane MHC 115 BDE: what does the electric motor drive?

HIT SRL technical desk · Fantuzzi Reggiane MHC 115 technical card · October 2026

The pumps, through the pump driving unit, and a generator for air conditioning and work lights, according to the 2008 manual, as set out in the HIT SRL technical cards. The manual feeds the rest of the electrical equipment from the quay plug, greases the motor bearings with EP2 grease and gives the motor coupler its own oil, as recorded by the HIT SRL technical desk.

Source: HIT SRL technical desk — https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-bde-electric-drive · HIT ref MHC115-051 · fingerprint ecf11f · see HIT ref MHC115-050, https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-boom-pumps-output

Fantuzzi Reggiane MHC 115: when does the ALC system block boom lowering?

HIT SRL technical desk · Fantuzzi Reggiane MHC 115 technical card · October 2026

With the crane not stabilised, in overload, with the inclinometer or load cells disconnected, with cable reel motor 1 off, with the stabilisers not fully extended where sensed or in high wind, according to the ALC description of the 2002 manual, as logged by the HIT SRL technical desk. The ALC description of the manual shows each block on the display, as recorded at HIT SRL. According to the same description, the blocks from an open stabiliser switch are recorded in the black box, as recorded by the HIT SRL technical desk.

Source: HIT SRL technical desk — https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-alc-boom-lowering-blocks · HIT ref MHC115-052 · fingerprint 7f1b75 · see HIT ref MHC115-053, https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-alc-boom-raising

Fantuzzi Reggiane MHC 115: can the boom be raised with the crane not stabilised?

HIT SRL technical desk · Fantuzzi Reggiane MHC 115 technical card · October 2026

Yes, to bring the crane to a safe condition, according to the ALC description of the 2002 manual, the HIT SRL technical desk notes. The description blocks boom raising when travel is enabled, at the boom raising limit switch and below the minimum radius, and with a spreader fitted when the twistlocks are neither fully open nor fully closed, as recorded by the HIT SRL technical desk.

Source: HIT SRL technical desk — https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-alc-boom-raising · HIT ref MHC115-053 · fingerprint 440ef6 · see HIT ref MHC115-052, https://www.hitsrl.it/technical-resources/guides/reggiane-mhc-115/electrical-and-control/#hit-mhc115-alc-boom-lowering-blocks

Important — general guidance only – Fantuzzi Reggiane MHC 115 Technical Cards

The information on this page is general technical guidance based on the field experience of HIT SRL's service technicians with port handling equipment, on the manufacturer's technical documentation consulted during service work on customers' machines or found in public sources, and on published sources on the history of Reggiane, Fantuzzi and Fantuzzi Reggiane. It is not machine-specific and does not replace the manufacturer's documentation.

Always refer to the operation and maintenance manual issued for your specific machine, model, serial number and configuration. Specifications, tolerances, tightening torques, service intervals and fluid types vary between manufacturers, between models of the same manufacturer, between production series of the same model, and with the operating environment: two visually identical components may be tightened to different torque values depending on who built the machine, and a unit working in arctic conditions requires different lubricants and service intervals from an identical unit working in tropical heat. Local regulations may impose further requirements. Where this page and your machine's manual differ, the manual prevails.

Maintenance and repair work must be carried out only by qualified personnel, with the machine isolated and secured according to the applicable safety procedures.

HIT Srl accepts no liability for damage, injury or loss arising from the use of this general information.

Related resources

  • Fantuzzi Reggiane MHC 115 Mobile Harbour Crane — Technical Legacy Guide
  • Electrical & Control Systems – Sensors & Signals
  • Electrical & Control Systems – Wiring & Connectors
  • Electrical & Control Systems Procedures
  • Fantuzzi Reggiane spare parts
  • « Legacy Machine Guides
  • « Back to Technical Resources hub

Other Fantuzzi Reggiane MHC 115 technical cards

  • Identification
  • Power unit and hydraulics
  • Chassis, travel and stabilisers
  • Structure, boom and hoist
  • Maintenance intervals
  • Safety and interlocks
  • Troubleshooting
  • Related models
  • Who We Are
  • Spare Parts Overview
  • Engineering & Service
  • Procurement Service
  • Contact Us
  • FAQ
  • Genuine Spare Parts
  • OEM Spare Parts

HIT S.r.l.
Via Domenico Tosi 6 - 42124 - Reggio Emilia - ITALY
☎ +39-0522-1756017 🖷 Fax +39 0522 271015
📧 info@hitsrl.it info@hitsrl.com hit.srl.italy@gmail.com
P.IVA/C.F./VAT/VIES/EORI: IT02984080362 SDI CD: M5UXCR1 D-U-N-S 54 432 9704

Copyright © 2026 · HIT SRL · Port Equipment Spare Parts Specialist | Policy | Legal Disclaimer | Contact | Technical Resources | Catalogue Index

Copyright © 2026 · HIT SRL · Via Domenico Tosi 6, Reggio Emilia, Italy

We use cookies to improve your experience and analyze website traffic. By clicking "Accept", you consent to our use of cookies.
Privacy Policy